Sales Case Studies
Lionel Hitchen (Essential Oils), England
Contact: Chris Dimmick
When the client suffered damage to an Apex 114 Comminuting Mill, Perry responded quickly. We not only supplied a replacement mill from stock, fitted with the correct blades, but also delivered the unit to the site one week after the inspection was made.
ICI Chemicals & Polymers, UK
Contact: Brian Collett
When a heat exchanger failed, production was brought to a halt and a replacement heat exchanger was on a long lead time. ICI contacted us with their requirement and we were able to supply and deliver a Johnson Hunt 4sqm Stainless Steel Heat Exchanger from stock. ICI modified and tested the unit and changed pipework runs to install it to their plant. The outcome was their plant was offline for 5 days instead of weeks of lost production.
Dynea Aycliffe Ltd, UK
Contact: Joe Kennedy
Production at Dynea stopped over a weekend when a reactor failed. By the following week Perry had sourced a Munk & Schmitz 19,500 Litre Stainless Steel Reactor from mainland Europe, shipped the unit to the site, carried out an inspection and had it installed.
Oxford Chemicals, UK
Contact: Allan Brownlee
The company's production capacity was reduced due to unexpected damage of a Cannon 1360 litre glass-lined reactor. One week later production was back to full capacity as we were able to produce an exact replacement from stock.
Norbrook Laboratories, Northern Ireland
The strength of our network proved itself on this project. Norbrook Laboratories urgently needed two refurbished glass-lined reactors. Our Polish office had their requirements in stock, at a competitive price and available in line with the project's schedule. The units were spark-tested, new motors and inverters were fitted, cleaned and repainted and delivered - all within 7 weeks.
Amylum Group Engineering, Belgium
Perry has supplied Amylum with numerous pieces of equipment, they have commented that the machines are always in good condition and the deals are handled efficiently.